Assess the property
Document arrival, occupant concerns, visible conditions, moisture, potential sources, and areas requiring further evaluation.

Orva connects assessment, affected-area mapping, containment, equipment, daily remediation activity, environmental monitoring, testing, and final documentation in one visible operating record.

Every field action strengthens the same record, helping technicians follow the plan while managers see conditions, exceptions, progress, and missing documentation in real time.
Document arrival, occupant concerns, visible conditions, moisture, potential sources, and areas requiring further evaluation.
Connect observations, samples, photos, and material conditions to the exact rooms and surfaces involved.
Establish the remediation boundary, scope, contents handling, engineering controls, and required authorizations.
Document barriers, critical seals, decontamination paths, signage, and the controlled zones protecting adjacent spaces.
Scan negative-air machines, scrubbers, dehumidifiers, and sensors into each zone and verify operating status.
Track removal, cleaning, HEPA vacuuming, antimicrobial application, debris handling, photos, and completed tasks.
Confirm visual completion, moisture targets, pressure history, equipment logs, and readiness for independent testing.
Connect test results, exceptions, final photos, signatures, and the completed remediation report for closeout.

Rooms, materials, source conditions, samples, containment controls, equipment, and tasks remain connected to the floor plan so the team can understand the work area at a glance.
Pressure, humidity, equipment runtime, filters, and exceptions can be reviewed without waiting for the next office update.
Negative air NA-04Zone ARUNNING
Air scrubber AS-12Zone BRUNNING
Dehumidifier DH-08Zone AON TARGET
Pressure sensor PS-02Zone BONLINE
Air scrubber AS-09Zone AFILTER DUE
Pressure varianceZone B · 8 minREVIEW
Filter replacement dueAS-09 · 612 hoursACTION
Photo set incompleteBathroom · daily logMISSING
Containment inspectionZone A · completeRESOLVED
Containment checks, equipment readings, completed work, changes, photos, and approvals become one chronological history while remediation is underway.
Orva brings the field record, environmental history, testing, exceptions, and approvals together so the project team can prepare for clearance with confidence.
Affected materials removed, detailed cleaning documented, and final visual review recorded by zone.
12 of 12 tasksMoisture, humidity, negative pressure history, and equipment logs remain within the defined work plan.
48 hours verifiedSample locations, testing appointment, access instructions, and required supporting records are organized.
Tomorrow · 9:00 AMAssessment, scope, daily logs, photos, equipment, results, exceptions, and signatures are connected.
2 items remainingThe same connected information supports the remediation team, the people managing the job, and the stakeholders following its progress.
Guided tasks, containment checks, equipment status, daily activity, photos, and required documentation remain visible at the point of work.
Control · Document · CompleteSee zone status, pressure, equipment, progress, exceptions, testing, and clearance readiness without chasing updates.
Monitor · Resolve · CoordinateShare an organized history of assessment, containment, work completed, conditions, testing, approvals, and final documentation.
Communicate · Verify · DeliverAssessment, affected-area mapping, containment, environmental readings, equipment history, daily logs, material removal, cleaning, photos, testing, exceptions, and approvals remain connected for delivery.
See how connected workflows create clearer operations and better outcomes.